The following is a complete list of all projects included in the Raymond Irrigation District (RID) under this program. There are four modernization projects and one shared reservoir project. 

Modernization Projects 

Raymond Irrigation District Modernization Projects Map
Raymond Irrigation District Modernization Projects

RS4 Pipeline 

RS4 Pipeline Map
RS4 Pipeline

This project replaces an open ditch channel with a closed pipeline to improve the efficiency of water delivery to approximately 630 acres. The pipeline is located northwest of Raymond. Replacing the open ditch with a closed pipeline will eliminate seepage and reduce spill.    

Schedule 

Construction is planned to start in the Fall of 2021 and to be substantially completed for the 2022 irrigation season.  

Cost Estimate  

Initial estimate: $573,000.  

9 Mile & North Pipeline 

9 Mile & North Pipeline Map

This project replaces an open ditch channel with a closed pipeline to improve the efficiency of water delivery to approximately 3,600 acres. The pipeline is located west of Raymond. Replacing the open ditch with a closed pipeline will eliminate seepage and reduced spill.   

Schedule  

Construction is planned to start in the Fall of 2021 and to be substantially completed for the 2025 irrigation season.  

Cost Estimate  

Initial estimate: $4,957,000.

Gravity Pressurized Pipeline System – Welling Phase

This project will convert a large open ditch canal into a closed pipeline to improve water conservation, decrease seepage and decrease land severance. This project also realigns the intake to improve water flow, conserve water and alleviate demand and stress on current infrastructure. 

Schedule 

This project is in the design phase, with construction to begin in the fall of 2023. The project will be substantially completed in the spring of 2025. 

Cost Estimate 

Initial estimate: $16,800,000.

Welling in Raymond Irrigation District Image

Reservoir Projects 

Chin Reservoir Expansion 

Welling in Raymond Irrigation District Map

Raymond Irrigation District (RID) receives most water deliveries under its water licenses from Alberta Environment and Parks via the St. Mary River Irrigation District (SMRID) Main Canal. Under the Main Canal Agreement, including SMRID, Taber Irrigation District (TID) and RID, the operation and maintenance of both the canal and in-line reservoirs are shared proportionally. RID will be participating 10 percent toward the Chin Reservoir Expansion project through the publicly announced funding arrangement and will benefit from 10 per cent of the achieved water savings through improved balancing.  

Refer to the SMRID projects overview for the description, schedule and cost estimate of this project.

Share this Post:

Photograph of WaterPortal Board Member Ross Douglas

Ross Douglas

Board Member

Ross has extensive executive experience in Operations, Governance, Information Technology and Strategy at the board and senior management level including Mancal Corporation, Mancal Energy, Highridge Exploration and Atlantis Resources. He has worked in Oil and Gas, Coal, Commercial Real Estate, Portfolio Management, Recreation, Retail and Water and Wastewater Treatment. His experience is also geographically diverse having overseen operations in Canada, the United States, United Kingdom and Northern Ireland. Additionally, he has been on the board of companies with operations in Argentina, Azerbaijan, Barbados, Kazakhstan, and Russia. He has served on numerous Public, Private and Not for Profit Boards across a number of industries.

Ross has been active on several industry Boards and committees including the Canadian Association of Petroleum Producers (CAPP) and The Schulich School of Engineering Industry Advisory Council at the Schulich School of Engineering.

Photograph of WaterPortal Board Member Brian Mergelas

Brian Mergelas, PhD, ICD.D

Board Member

Brian is a seasoned Cleantech entrepreneur with a proven history of successfully bringing complex water technologies to the market.   With over 25 years of experience, he has led various organizations to achieve significant milestones in the industry. 

Having started as the founding CEO of the Pressure Pipe Inspection Company (PPIC) and later taking the helm at the Water Technology Acceleration Project (WaterTAP), Brian’s entrepreneurial spirit has been instrumental in driving innovation and growth within the sector. 

He is an active investor in the cleantech sector and has served on many boards including the Ontario Clean Water Agency. 

Actively engaged in industry associations like AWWA, WEF, IWA, and ASCE, Brian enjoys collaborating with fellow professionals to promote advancements in the field. 

Brian holds an undergraduate degree and a PhD in Physics from Queen’s University, which has provided him with a solid technical foundation.   As a member of the Institute of Corporate Directors, he brings valuable insights to corporate governance.