Groundwater
The Comox Valley Regional District (CVRD) has selected Carollo Engineers to lead the comprehensive site master plan finalization and detailed design of Phase 4 upgrades at the Comox Valley Water Pollution Control Centre (CVWPCC). Originally constructed in the early 1980s with a projected 50-year operating life, the facility requires upgrades to maintain reliable service and increase capacity to support regional population growth. Click here to read the story. Click the following link for more information on Infrastructure.